...

Hosting

Our Hosting

Reliable Hosting Solutions for Seamless Mining

Standard Hosting
  • Power Rate $0.6 per kw
  • Cooling Air Cooling
  • Location UAE
  • Energy Grid / Mix
  • Models Any above 3 kw of power
  • Tenure Minimum 1 month and renewable
  • Maintenance Included - in warranty period
  • Repair AMC Available
  • Deposit 2 months hosting charges
  • MOQ Below 10 standard ASICS
Premium Hosting
  • Power Rate $7.5 per kw
  • Cooling Air Cooling
  • Location UAE
  • Energy Grid / Mix
  • Models Any above 3 kw of power
  • Tenure Minimum 1 year and renewable
  • Maintenance Included - in warranty period
  • Repair AMC Available
  • Deposit 2 months hosting charges
  • MOQ Above 10 standard ASICS
Hydro Hosting

Coming Soon

Bitcoin Mining Hosting Services

Reliable and secure Bitcoin mining hosting services with 24/7 monitoring, optimal cooling, and top-tier security.
Arabic
Scroll to Top
#!trpst#trp-gettext data-trpgettextoriginal=6107#!trpen#Seraphinite Accelerator#!trpst#/trp-gettext#!trpen##!trpst#trp-gettext data-trpgettextoriginal=6108#!trpen#Optimized by #!trpst#trp-gettext data-trpgettextoriginal=6107#!trpen#Seraphinite Accelerator#!trpst#/trp-gettext#!trpen##!trpst#/trp-gettext#!trpen#
#!trpst#trp-gettext data-trpgettextoriginal=6109#!trpen#Turns on site high speed to be attractive for people and search engines.#!trpst#/trp-gettext#!trpen#